Skip to content
Tether

How do you migrate supply planning data without a data-cleaning project?

Gary SahotaGary Sahota
November 2, 2026
2 min read
Migrate without cleaning your data headline above messy spreadsheet columns wired to a clean Tether product record

When you migrate supply planning data off spreadsheets, Tether's team handles the data migration and mapping, and no data cleaning is required. Implementation typically takes 2 to 4 weeks. Tether can run on top of the ERP you already have, and every purchase order arrives drafted.

Get support while Tether's team moves the data

Your team has a direct line to Tether during the move.

Every plan includes a dedicated Slack channel or email for support and optional weekly 30-minute calls during onboarding. Tether charges no onboarding fees.

Connect sales sources

Sales data reaches Tether through connections to the systems that already hold it.

Tether pulls sales from Shopify, Amazon, EDI, ERP, or data warehouses like BigQuery and Snowflake and updates the numbers near real-time with lightweight delta syncs. The integrations page has the full list.

Tether plans with your supplier rules, BOMs, and costs

Tether respects MOQs, lead times, batch sizes, and pallet counts for each supplier and routes orders across multiple suppliers.

Tether supports multi-layer BOMs for semi-finished goods and kits. It also keeps one price sheet per SKU per channel and calculates per-unit landed cost with freight, duties, and tariffs.

Check the first drafted orders

Use the first drafted purchase orders as one check on your supplier settings in Tether.

Drafts appear the moment your coverage hits your reorder point. Each draft already respects your supplier minimums, lead times, and preferences. A draft with a minimum or lead time you do not recognize is worth raising with Tether's team.

Because drafts follow the reorder point, the first ones will not cover every supplier, so spot-check a few others as well. After stock arrives, Tether runs an automatic analysis and reconciliation of the initial plan against the actual receipt.

FAQ

What happens to our ERP and 3PL during the migration?

Tether can run as a planning layer on top of the ERP you already have, replace an ERP you have outgrown, or serve as the foundational system for a brand with no ERP yet. Your 3PL or WMS still runs the floor.

Do products we add after go-live need their BOM built by hand?

New products inherit their BOM automatically, so your team does not build it by hand. The MRP page covers bill of materials planning in more depth.

Which stock states does Tether track?

Tether tracks stock as on hand, sellable, committed, unsellable, in production, and in transit. Committed stock is stock reserved for orders.

Connect to 260+ Tools

Sync your eCommerce, 3PLs, Warehouses, ERPs, and other data platforms with Tether.

See All Integrations

See how Tether replaces spreadsheets

Plan smarter. Ship faster. Your supply chain, under control.

Meet Tether AI ✨